a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

The main purpose of drama is performance.Select oneO TrueO False​
A man bought four cups of coffee and left a $7 tip. A woman bought eight cups of coffee and only left a $2 tip. If they paid the same amount, how much was each
Volume 729 cm3 Find the length of a single side for each cube
En la epoca precolombina, el paujil era símbolo de:
Help plsss. Select the student who solved this equation correctly X + 7 = 19
michalle bought a new tablet for 360 last month now it priced at 280 what is the percent of change in price of the tablet
Zoe is a chemistry teacher earning a salary of $38,000 per year. She also tutors part-time, charging $20 per session. Which of the following types of income doe
A teacher divided the class into two groups of equal size. ⅗ of the first group are right-handed. 80% of the second group are right-handed. What fraction of the
Please anyone help please help
Hi, help will be appreciated, thanks