Monkeyfeet Monkeyfeet
  • 03-10-2020
  • Mathematics
contestada

A construction company needs to remove 24 tons of dirt from a construction site. They can remove 3/4 tons of dirt each hour. How long will take to remove the dirt? Write your answer in hours.

Respuesta :

zaynah29cfc
zaynah29cfc zaynah29cfc
  • 03-10-2020

Answer: 32 hours?

Step-by-step explanation:

24 / (3/4) = 32

Answer Link

Otras preguntas

Tungsten trioxide (WO3) has a rich yellow color and is often used as a pigment in ceramics and paints. In order to test a ceramic vase for its WO3 content, a 10
Find the distance between each pair of points 8) (2, 6), (5, 10) 9) (-3,-10), (-3,5)
3(2x - 4) in distributive property
what is the equation 22-2h=-5?
what is two ratios equivalent 3:11​
What is the purpose of a career test?
Math Skills Solve a One-Step Equation 6. The mass of a mineral is 9.6 g. The mineral is placed in a graduated cylinder containing 8.0 mL of water. The water lev
The Smith family has very little money and no health insurance. A researcher approaches them and promises free health care for their children for two years if h
Is 5/8 a whole number
How are cleavage and fracture of minerals different?